12.12.03 LETTER FROM PG&E
Gary Tognozzi
Superintendent General Construction
2180 Harrison Street
San Francisco, CA 94110
As you may know, Pacific Gas and Electric Company is working to
supply power by July 2004 to the Letterman Digital Arts Center under
construction at the Presidio. To do so, it is necessary to trench
along Filbert Street between Lyon and Fillmore.
It is not necessary to trench along Filbert
Street, since the Fillmore-Filbert-Lyon Street route is not the
only possible route. A more thorough and public review needs to
be conducted discussing the alternatives, including the uninhabited
open space adjacent to Marina Boulevard and into the Presidio, and
power generation from within the Presidio itself.
This power line will be underground and the disruption will be temporary.
The work will be done in accordance with all permit restrictions.
In recent months we have attended a number of community meetings,
responded to letters and fielded numerous phone calls from neighbors
concerned about the project.
We are writing because there appears to be an enormous amount of
misinformation circulating about the projectâ€s
impact and we wanted to clear up any misunderstanding you may have.
PG&Eâ€s Obligation To Serve: PG&E is currently
working to construct a 12,000-volt (12 kV) distribution circuit
to the Letterman project.
A 12,000 volt (12 kV) distribution line to
Letterman, yes, but a second conduit will be placed in the open
trench to receive another 12,000 volt (12 kV) distribution circuit
for future development, as acknowledged by Mr. Tognozzi on 11.19.03,
which will most probably be in the Presidio with new housing units
planned.
Once Letterman applied for new power service in October of 2001,
PG&E became obligated to supply the power pursuant to our California
Public Utilities Commission mandated duty to provide electric service.
In this case, Letterman requested power by July 1, 2004. We are
treating this customer just as we do any customers requesting new
service, be it a residence, hospital, school or high rise - they
are entitled to power and we are required to provide it.
The Route: Pursuant to our duty to provide service, PG&E selected
the trench route -- as it does for every project -- based on engineering
criteria, such as adequacy and reliability of electric supply and
efficiency of construction, as well as approval from appropriate
permitting agencies.
Mr. Tognozzi stated at the 10.23.03 Community
Meeting that the reasons the Greenwich now Filbert route was selected
are to:
1. Tie circuits together for reliability of service - PG&E chose
to tie into a circuit at Chestnut and Fillmore en route to Greenwich,
and now Filbert
Response - PG&E could have made it a destination line
2. House a capacitor(s) - 1 capacitor for each powerline, 2 possible
powerlines, thus 2 possible capacitors. PG&E elected to mount
the capacitor for Lucasfilm Ltd. on an existing utility pole; the
only poles left near the east wall of the Presidio are located at
Lyon/Lombard, the Greenwich corridor, and Filbert at Baker and Broderick;
capacitor could have been pad mounted and placed on the ground in
the Presidio; PG&E stated they did not want the capacitor on
federal property because PG&E did not want the Federal Government
taking over and running the equipment in a time of emergency; now.
PG&E has backed off that statement and states that the Presidio
Trust did not want the capacitor on Presidio property from the onset
Response - capacitor should have always been planned to be located
in the Presidio; negotiations are now taking place to locate the
capacitor in the Presidio, which of course changes the need to run
the powerline where utility poles currently exist - Filbert, Greenwich,
Lyon
3. Cross Highway 101 (Lombard) at Fillmore - PG&E stated it
was safer to cross Lombard at Fillmore than Richardson (Hwy 101)
at Francisco (straight-line route) due to the speed of traffic
Response - Taking the Marina Blvd. Route entirely avoids crossing
Hwy 101; if the Francisco route were selected, vehicles would be
slowed down "in the cone zone" on Richardson as with any
highway project
4. Alhambra/Francisco is the straight-line route, but 3 blocks of
Francisco had been recently repaved and a 5-year moratorium keeps
most construction projects from occurring.
Response - in the distribution of power, if it saves the ratepayers
money, trenching a recently repaved street can be considered; to
travel 8 blocks off the straight-line route to Filbert is costing
PG&E, therefore the ratepayers, $1.2 million ($150,000 per block)
The route for this project satisfies the above criteria because
it made the most sense from an engineering perspective and was the
one route for which we could secure necessary permits.
We have no information on the feasibility
of any other route. The request to Mr. Tognozzi to receive PG&E's
cost analysis to trench on Fillmore-Filbert-Lyon vs. Alhambra/ Francisco
has been repeatedly denied. If PG&E had considered the Marina
Boulevard route adjacent to the Marina Green, they would not have
needed to apply and pay for a permit from CalTrans to cross Hwy
101
Again, while we understand the neighbors†concerns,
the only possible result of re-routing the project, even if it were
feasible, would be to shift the project to another street in the
area.
Re-routing would not necessarily shift the
project to another street if it could travel adjacent to the Marina
Green. PG&E stated that that route was never considered yet
could be the most efficient and economical. Moreover, a direct route
would minimize the number of residents affected by the "project"
Health and Safety: A few Cow Hollow residents have misstated that
this project would bring dangerous levels of power and risk the
health of local residents by exposing them to high levels of electric
and magnetic fields (EMF). We want to be absolutely clear on this
point: PG&E is complying with all environmental regulations.
WE DON'T AGREE: CNFFL 11.26.03 LETTER TO CPUC
There has been no Environmental Impact Report (EIR) or Negative
Declaration that are the minimum requirements of the California
Environmental Quality Act (CEQA), Pub. Res. Code §§ 21000
et seq., or evidence of any environmental clearance of any kind,
formal or informal. DPW has ignored the Project's potentially significant
and undesirable environmental impacts. As a matter of common practice,
such impacts must be brought to the public's attention so that alternatives
may be sought and mitigation of adverse impacts may be planned.
PG&E now asserts, by its letter of November 12, that the small
portion of the project that is under CalTrans's jurisdiction is
exempt from CEQA per "the General Orders of the CPUC,"
but cites no specific authority for this proposition; nor does it
even mention the CEQA responsibilities of the City of San Francisco,
which has jurisdiction over the lion's share of the Project.
There has been no consideration of the "Precautionary
Principle" that is a new City policy applicable to all agencies
and all businesses operating here effective this past summer. Ch.
1 § 101 SF Environment Code. Key elements of this new policy
include adequate notice to the community, a considered analysis
of the human health risks of various alternatives, and a transparent
and participatory decision-making process. DPW failed to consider
reasonable alternatives to the current location of the Project,
which passes through densely populated residential and neighborhood
commercial areas, along the side and front of Marina Middle School
and in close proximity to underground petroleum tanks.
This is not a high-voltage transmission line, as some have incorrectly
alleged, but a 12,000-volt (12 kV) distribution line. This is standard
voltage for distribution lines throughout PG&Eâ€s
service territory, including San Francisco. In other words, the
power PG&E intends to supply to Letterman is neither excessive
nor atypical. In fact, there are more than 250 circuits of underground
and overhead electric lines throughout San Francisco. Most of the
power lines in residential neighborhoods are 12,000 volts (12 kV),
but range from 4,000 volts (4kV) up to 230,000 volts (230kV).
Again, PG&E has not even discussed watts,
only volts. We understand that Filbert Street has an existing 12,000
volt (12 kV) distribution line, which carries a load of approximately
2,000,000 watts (2 mW); Lucasfilm needs 8,000,000 watts (8 mW) of
supplied power, but had initially requested 12,000,000 watts (12mW),
which the line can carry; the 2nd conduit has the same capacity
- 12,000,000 watts (12mW); in the future, with the projected development
in the Presidio and when both lines carry power, the street could
have thirteen (13) times the amount of wattage that it currently
has (26mW vs. 2mW), on three 12 kV lines (vs. the current one 12
kV line). Is this typical for a residential neighborhood to carry
up to 26 mW on three 12 kV powerlines?
| Powerlines |
Watts in mW (1,000,000 watts)
|
# 12 kV (12,000 volt) Powerlines
|
| Filbert- existing |
2
|
1
|
| Filbert- 1st Powerline - Lucas |
8 up to 12
|
1
|
| Filbert- 2nd Powerline |
up to 12
|
1
|
| TOTAL |
up to 26
|
3
|
As to concerns about EMF,
EMF is present where electricity is used. This includes distribution
lines, but also the building wiring in homes, offices, and schools,
and in the appliances and machinery used in these locations. The
California Public Utilities Commission (CPUC) and California Department
of Health Services have not concluded that exposure to magnetic
fields from utility electric facilities is a health hazard. For
more information about the California Public Utilities Commissionâ€s
EMF policies, please visit the CPUCâ€s website
at: www.cpuc.ca.gov/static/industry/environment/electromagnetic+fields/index.htm.
PG&E is only telling half the story: The CPUC and the California
Department of Health Services (DHS) have not reached a conclusion
either way on EMFs -- safe or not safe. Given the uncertainty, they
have begun instructing the utilities to take reasonable measures
to minimize the potential risks. What PG&E didn't direct us
to is the California Department of Health Services EMF Long Fact
Sheet as referenced earlier in the beginning of this letter. Again,
the amount of wattage determines the strength of the magnetic fields,
which don't reach low background levels until 60 - 200 feet from
distribution lines, such as the Lucas Powerline.
PG&E is installing all underground facilities in strict accordance
with the safety rules of the California Public Utilities Commission,
including meeting proper depth for underground electric facilities
and shielding of power lines.
Notice: On August 19, 2003, PG&E sent 30-day construction notices
to all 1,240 residents and property owners directly along the construction
route in accordance with notice procedures required by the City
and County of San Francisco. We have subsequently verified this
advance notice was properly completed.
DPW (Public Works Code 2.4.50) requires "
the
permittee shall provide written notice
to each property owner
on the block(s) affected by the excavation and each affected neighborhood
and merchant organization that is listed in the City Planning Department's
Directory of Neighborhood Organizations and Service Agencies. The
latest City-wide assessor's roll for names and addresses of owners
shall be used for the mailed notice. . ."
No neighborhood organizations received the notice, only individuals
associated with the organizations, and no names were used in addressing
the letters. The Public Works Code, thus the notice was not properly
completed.
Capacitor: Per the request of Cow Hollow neighbors, PG&E is
working with the Presidio Trust to evaluate the relocation of a
capacitor on Trust property and, therefore, out of view of local
residents. We will notify neighbors as soon as we know more.
It is interesting that we could have an influence
on the location of the capacitor, but not on the location of the
route. PG&E received the 10/10/03 letter from the Cow Hollow
Association, which represents 1100 housing units, to oppose the
selected PG&E Power Line Route for the Letterman Digital Arts
Center through the Cow Hollow neighborhood, and to request that
no work commence on the Filbert Street corridor. This was days before
the trenching turned the corner at Bay and Fillmore, yet there was
no response from PG&E. When a few concerned neighbors were invited
to walk the neighborhood with representatives from PG&E and
DPW on 11.19.03, no criteria were used for selecting the location
for the capacitor. Mr. Tognozzi concluded that residents may not
like to look at the 8 ft wide x 2.5 ft x 2.5 ft capacitor approximately
35 feet up a pole at Filbert and Broderick, so he moved the capacitor
to Filbert and Baker, and then thought about moving it to Lyon and
Lombard. Before DPW could review that location, PG&E that day
had replaced the 35 ft pole next to Liverpool Lil's with a 50 ft
pole in order to house the capacitor at that location. Then Mr.
Tognozzi suggested, after EMF concerns affecting the nearby apartment
building were raised by DPW's Cynthia Chono, that the better location
would be across the street on Lyon next to the stone wall at the
Lombard entrance to the Presidio. Looking up the hill and noting
all the homes that would be impacted by the pole-mounted capacitor,
discussion involved pad mounting it next to the wall, which would
leave approximately 7 feet of sidewalk for pedestrians. We all concluded
in the end that the capacitor should be in the Presidio. In addition,
the capacitor location is not only a view issue, but also a planning
(why not in the Presidio?), health (unknowns around EMFs), and safety
(8 ft (wide) x 2.5 ft x 2.5 ft box approximately 35 feet up a utility
pole) issue.
Again, we appreciate your concerns and hope we have provided some
useful information. We expect to complete the substructure portion
of this project, weather permitting, in January 2004, working around
the holiday moratorium. Thank you for your understanding.
Should you have any additional concerns please feel free to contact
PG&E at (415) 695-3451.
Sincerely,
Gary Tognozzi

|